MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County from Sunday, March 31 through Saturday, April 6 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1: Rocky Creek Bridge, Big Sur: April 1 – April 5
One-way traffic controls will be in place on Highway 1 near the Rocky Creek Bridge for road repairs and work on the bridge from 7:30 a.m. to 5:00 p.m. on Monday thru Thursday. Work hours on Friday will be 7:30 a.m. to 2:30 p.m.

Highway 1: Bixby Creek Bridge – Rocky Creek Viaduct, Big Sur: April 2
One-way traffic controls will be in place on Highway 1 between the Bixby Creek Bridge and the Rocky Creek Viaduct for work along the shoulder of the highway from 8:00 a.m. to 2:00 p.m.  

Highway 1: Mill Creek Bridge, Big Sur: April 1 – April 5
One-way traffic controls will be in place on Highway 1 at the Mill Creek Bridge due to repair work on the bridge from 7:30 a.m. to 5:00 p.m. on Monday thru Thursday. Work hours on Friday will be 7:30 a.m. to 2:30 p.m.

Highway 1 Climbing Lane Project: Carmel: April 1 – April 2
Construction work will continue in the Climbing Lane area on Highway 1 between Carmel Valley Road and Rio Road.

The signal mast arm at Highway 1 and Carmel Valley Road has been removed and a replacement is now in place. Work in the area will be limited this week to two days on Monday and Tuesday.

Here is the schedule for hours and work detail for the week of April 1, 2019:

Project Site: Highway 1 at Carmel Valley Road

  • This is phase one of the project.
  • Daytime work hours will be 8 a.m. to 5 p.m.
  • Crews will be on site Monday and Tuesday
  • One of the southbound left turn pocket lanes onto Carmel Valley Road will be closed to traffic during construction.

Monterey County RMA-Public Works will provide weekly updates about this project. Residents or commuters who may be affected by this work can be included in an email information list to receive alerts about the project. Contact Maia Carroll, Communications Coordinator, at carrollm@co.monterey.ca.us

Highway 1: Sloat Avenue – Fremont Street, Monterey: April 3 – April 4
One lane closure will occur along Highway 1 between Sloat Avenue and Fremont Street in Monterey for vegetation control from 9 a.m. to 2:30 p.m. 

Highway 68 – Spreckles to Monterey: March 31 – April 3
There will full night-time closure of the off ramps on westbound Highway 68 between Spreckles and Fairgrounds Road in Monterey for sign work from 9 p.m.to 6 a.m.

Highway 68 – Salinas River: April 1  – April 5
There will be alternating lane and ramp closures on eastbound and westbound Highway 68 between Spreckles Blvd and Reservation Road for bridge work. The work will occur from 9 a.m. to 3 p.m.

Highway 68 – Salinas River: March 31- April 5
There will be alternating night-time lane and on ramp closures on eastbound and westbound Highway 68 between Spreckles Blvd and Reservation Road for bridge work. The work will occur from 7 p.m. to 6:30 a.m.

Highway 68 – John Street/Main Street – Stephanie Drive, Salinas: March 31 – April 3
There will be alternating night-time lane a closures on eastbound and westbound Highway 68 between John Street/Main Street and Stephanie Drive in Salinas for sign work from 9:00 p.m. to 6:00 a.m.

Highway 101: East Garrison, Camp Roberts: April 1 – April 5
Alternating lane closures will occur on Highway 101 at East Garrison for roadway excavation work from 6 a.m. to 4 p.m.

Highway 101: San Luis Obispo County Line – King City: March 31 – April 2
Various nighttime ramp and lane closures will occur along northbound and southbound Highway 101 between the San Luis Obispo County Line and King City for sign work during the evening from 9 p.m. to 6 a.m.

Highway 101: Teague Avenue, Soledad: March 31-April 1
Traffic breaks will occur on northbound and southbound Highway 101 at Teague Avenue in Soledad for utility work from 10 p.m. to 6:30 a.m.

Highway 101: Spence Road/Abbott Street, Salinas: March 31
Traffic breaks will occur on northbound and southbound Highway 101 at Spence Road/Abbott Street in Salinas for utility work from 6 a.m. to 12 p.m.

Highway 101: Boronda Road, Salinas – San Benito County Line: April 2 – April 5
A moving lane closure will occur along northbound Highway 101 between Boronda
Road in Salinas to the San Benito County Line for a sweeping operation from 9 a.m. to 2 p.m.

Highway 156: Monte Del Lago – Highway 183, Castroville: April 3 – April 5
Various nighttime ramp and lane closures will occur along Highway 156 between Monte Del Lago and Highway 183 for sign work during the evening from 9 p.m. to 6 a.m.

Highway 183: Market Street – Salinas Street, Salinas: April 3 – April 5
Various nighttime ramp and lane closures will occur along Highway 183 between Market Street to Salinas Street for sign work during the evening from 9 p.m. to 6 a.m.

Highway 218: Roberts Avenue – Amador Avenue, Seaside: April 3 – April 5
Various nighttime ramp and lane closures will occur along Highway 183 between Market Street to Salinas Street for sign work during the evening from 9 p.m. to 6 a.m.

Highway 218: Via Verde – General Jim Moore Blvd., Del Rey Oaks: April 4
One-way traffic controls will be in place on Highway 218 (Canyon Del Rey) between
Via Verde and General Jim Moore Boulevard in Del Rey Oaks for utility work from 8:30 a.m. to 3:30 p.m.

 

###