Cone Zone Report

MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County from Sunday, September 29 through Saturday, October 5 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1: San Luis Obispo County Line – Lime Creek Bridge: September 30 – October 3
One – way traffic controls will be in place on northbound and southbound Highway 1 between the San Luis Obispo County Line and Lime Creek Bridge for paving work along the highway from         7 a.m. to 3:30  p.m.

Highway 1: Bixby Creek Bridge – Hurricane Point: September 30 – October 4
One – way traffic controls will be in place on northbound and southbound Highway 1 between Bixby Creek Bridge and Hurricane Point for slope repair work along the highway from 6 a.m. to 3 p.m.

Highway 1: State Route 218 : October 1
One lane closure will occur along southbound Highway 1 at State Route 218 (Canyon Del Rey Blvd.) for bridge work from 9 a.m. to 2 p.m.

Highway 1: Munras Avenue, Monterey: October 2
One lane closure will occur along northbound Highway 1 at Munras Avenue for bridge work from 9 a.m. to 2 p.m.

Highway 68: Pacific Grove – Monterey: Now – December
Intermittent lane & shoulder closures will occur in the evenings along Highway 68 from Piedmont  Avenue to Highway 1 for  road work to widen shoulders, refresh striping, improve signage, upgrade guardrail, place a safety edge with shoulder backing, and install rumble strips.

The closures will occur, Sunday through Friday from 8 pm to 6 am, with advanced notification as the project progresses. Electronic message signs will be posted to alert motorists of this roadwork. Delays are expected to be minimal.

Highway 68: Acacia Street – Hawthorne Street, Salinas: October 2
One lane closure will occur along eastbound Highway 68 (Main Street) for pavement repair work from 8:30 a.m. to 3:00 p.m.

Highway 101: Espinosa Road – San Benito County Line: October 1 – October 4
A moving lane closure will occur along Highway 101 between Espinosa Road and the San Benito County Line for vegetation spraying from 8:30 a.m. to 2:00 p.m.

Highway 101: East Market Street, Salinas: Now  – September 30                                                                                                                                                                                                                               A major four-mile project to upgrade the pavement in both directions of U.S. Highway 101 between East Market Street and Boronda Road continues with the second phase of ramp reconstruction.

Motorists will encounter 24/7 ramp closures in the following locations:

  • The northbound US 101 off-ramp to East Market Street will be closed through Monday, September 30.  Motorists may detour by using North Main Street to East Market Street.
  • The northbound US 101 on-ramp at East Market Street will be closed through Monday, September 30. Motorists may use East Market Street to North Madeira Avenue to the northbound US 101 on-ramp.
  • The southbound US 101 off-ramp at North Main Street will be closed until Tuesday, September 24. Motorists may detour by exiting at Laurel Drive proceeding east to North Main Street.
  • The southbound US 101 on-ramp at North Main Street will be closed through Friday, October 4. Motorists may detour by proceeding on North Main Street to East Market St to the southbound US 101 on-ramp.

Highway 101: Alta Street/Old Stage Road–Little Bear Creek Bridge, Salinas: Sept. 29 – Oct.4
Nighttime lane closures will occur along northbound and southbound Highway 101, between  Alta Street/Old Stage Road and Little Bear Creek Bridge in Salinas for paving work on the roadway and ramps from 7 p.m. to 6 a.m.

Highway 101: Camp Roberts: Now – October 11
One long-term on-ramp closure will occur along southbound Highway 101 at Camp Roberts for paving work from 6 a.m. to 2 p.m.

Highway 101: San Ardo – San Lucas: Now – December 31
One long-term lane closure will occur along northbound and southbound Highway 101 between the Paris Valley Road overcrossing and the Rancho undercrossing for grinding and paving work.

Highway 101: Wild Horse – First Street, King City: Now – January 2020
One long-term lane closure will occur along northbound and southbound Highway 101 between Wild Horse Road and First Street for roadway excavation work from 5 a.m. to 12 p.m.

Highway 183: Clark Street – Villa Street, Salinas: October 2
One lane closure will occur along northbound Highway 183 (Market Street) between Clark Street and Villa Street for utility work from 9 a.m. to 2 p.m.

Arroyo Seco Road: Highway 101 – Paraiso Springs Road: September 30 – November 27
Traffic controls and a pilot car will be in place along Arroyo Seco Road between Highway 101 and Paraiso Springs Road for road construction work, Monday – Friday, from 7 a.m. to 5 p.m.

River Road: Chualar River Road – Limekiln Road: September 30 – December 20
Traffic controls and a pilot car will be in place along River Road between Chualar River Road and Limekiln Road for road construction work, Monday – Friday, from 7 a.m. to 5 p.m.

###